Drinking Water from the Well Field of the Bayakh-Diender-Thieudem Axis

Año
  • 2019
País
Senegal
Ciudad
Dakar
Estado
  • Realizado
Capacidades
Cliente
  • National Water Company of Senegal (SONES)
Objetivos de Desarrollo Sostenible
Agua limpia y saneamiento Ciudades y comunidades sostenibles

Dakar Emergency Plan for Access to Drinking Water from the Well Field of the Bayakh-Diender-Thieudem Axis

The project aims to reinforce drinking water supply in Dakar and involved:

  • the construction and equipment of 11 new boreholes with a unit capacity of 100 to 200 m³/h (5 on the Bayakh - Diender axis and 6 on the Diender  -Thieudem axis),
  • the construction of a pumping station and a storage tank (1,500 m³),
  • the laying of a cast iron supply pipe of nominal diameter 700/500 mm between Bayakh and Rufisque (18.6km),
  • the laying of a discharge pipe between Thieudem and Bayakh stations. 
     

Nuestra Mision

  • Technical studies
  • Control and works supervision