Ghana
Navrongo
Navrongo Water Treatment plant
- Year
-
- 2020
- Country
-
Ghana
- City
-
Navrongo
- Status
-
- Realised
- Capabilities
- Client
-
- Republic of Ghana
- Partners
-
- Denys Engineers & Contractors BV
- Sustainable development goals
-
New water treatment plant aimed at improving water supply in and around Navrongo
The project involved the design and construction of:
- the treatment plant (20,500 m³/day),
- two new elevated water reservoirs (600 m³ and 400 m³),
- three buildings, including one for the General Services,
- a building housing the reception (20x20m),
- a high-lift pump station with underground reservoir,
- a foundation slab for the Chemical Waste Treatment Plant,
- an intermediate pumping station (70 m³/h),
- a chemical building.
Our mission(s)
Structural engineering services:
- formwork drawings (concrete structures) based on the process plans,
- reinforcement drawings (reinforced concrete structures),
- quantity survey related to the formwork drawings (cubi meters of concrete and formwork),
- steel list,
- list of plans.