Peru
Lima
Lima Metro
Once completed, the metro line will facilitate transport for 1 million people per day
The Lima Metro line 2 project, 26.87 km in length, will run between the Lima's central Ate district and Callao (part of the greater metropolitan area) and have 27 stations.
In addition to the construction of 2 train depots, the project comprises 21 km of tunnel:
- 9.38 km bored with the Earth Pressure Balance Machine (EPBM),
- 1.12 km according to the new Austrian Tunnelling Method (NATM),
- 0.3 km in cut and cover.
Our mission(s)
- Procurement support
- Detailed design
- Study of the ventilation system
- Technical assistance for the construction of the sections 1A and 1B