Belgium
Ramegnies-Chin
Antour Farm estate
Transformation of the Antour farm to set up a center for adults with disabilities
The project is broken down into two phases.
- The first concerns the development of existing buildings A, B, C and D: 4 living units each accommodating 10 people, 3 enclosed gardens, 1 professional kitchen with restaurant and parking.
- The second concerns the construction of a new building (building E): reception, multipurpose sports area, multisensory “Snoezelen” area, covered hall and swimming pool.
Our mission(s)
- Structural engineering and technical building services: studies and work supervision
- EPB mission